Optimal Choice of Travelling System Structure depending on Design Parameters of Hoisting System in Drilling Units of Oil and Gas Wells

Authors

  • Dr. Mahmoud M. Hadid Petroleum Department / Chemical and Petroleum Engineering College /AL Baath University / Homs, Syria
  • Ahmed A. Mohammed Petroleum Department / Chemical and Petroleum Engineering College /AL Baath University / Homs, Syria

DOI:

https://doi.org/10.52716/jprs.v12i1.594

Keywords:

Design Indicators, Drilling Unit, Drilling lines, Hoisting System, Hook load, travelling System

Abstract

Most drilling rigs are designed based on the max static load on the hook of great travelling system structure as 6×7. But when change the depth of the well, the load on the hook changes, so it was necessary to determine the travelling system structure, which ensures the best design indicators  of hoisting system.

This research studied the impact of travelling system structure on design parameters of hoisting system and the best indicators of hoisting systems at less drilling lines number suitable with max allowable load on hook   for oil and gas wells drilling units.

In this work, A methodology depending on graphical solution for hoisting system indicators curves has been developed. (MATLAB) has been used in order to develop a program that facilitates the application of this methodology and accelerate the work. The most important technical parameters for different drilling unit, in addition to the allowable hookload, by using the most important design indicators that positively or negatively affecting the system with changing travelling system structure. This program depending on graphical solution for set of these indicators in relation with number of drilling lines by finding equilibrium point between positive and negative effects that has the algebraic sum of the slopes is as close as possible to zero. This point represent optimal drilling lines compatible with hookload at practical technical parameters for drilling units.

This study achieves the best indicators for hoisting system working at ideal travelling system and decrease the time required for drilling by increasing hook velocity rate by 12% and the efficiency of hoisting system by 10%. In addition, the lengths of drilling line rate decreased by 40% that cause reduction in material cost and achieving better economic feasibility in comparison with design travelling system.

References

Davis LD. THE BLOCKS AND DRILLING LINE. Second Edition. Houston: Texas; 1981.

Davis LD. THE BLOCKS AND DRILLING LINE. Third Edition. Houston: Texas; 1996.

Adozokpe J. Hook load Measurement made with a drawworks as a function of sensor placement and dynamic condition. M.Sc. Thesis. University of Stavanger; Stavanger, Norway: 2014.

Jack FE, David SP.APPLIED DRILLING ENGINEERING. First Edition. Richadons.TX: U.S.A; 1972.

Ganolde G, Nguyen JP. DRILLING DATA HANDBOOK. Third Edition. Richardson. TX: U.S.A; 1999.

Wolfgang FP. DRILLING ENGINEERING. Curtin university of Technology: Australia; 2007.

American Petroleum Institute. Recommended Practice on Application care, and use of wire rope for oil field service. API: Washington; June 2005.

Aljoahry M. Impact of travelling system structure on design parameters of hoisting system in drilling units. Journal of Albaath University 2002; v4:24-41.

Ellis HA, Drilling Engineering Handbook. International Humans Resources Development Corporation; 1983.

Marchand P, Holland T. Graphics and GUIs with MATLAB. CRC Press Company, LLC, Florida: 2003.

Violeta Ivanova, PH.D., MATLAB Tutorials, Educating Technology Consultant MIT Academing Computing.

Hadid MM. Mechanics of Drilling and Production Equipment. First Edition. Albaath University. Homs, Syria; 2007.

Drumeanu A, Antonescu N., “THE DRILLING DRAW-WORKS BAND BRAKES THERMAL REGIME.NATIONAL TRIBOLOGY CONFERENCE”; 2003; 148:147-152.

Syrian Petroleum Company. Downhole Well Profile. Middle area oil fields; 2017.

KCA DEUTAG. T-19 NATIONAL 110M. April; 2015

KCA DEUTAG. T-80 NATIONAL 1320UE, November; 2015.

Internet source: Moscow prompetrol. uralmash drilling rigs:Avaiable from: http://Moscow.prompetrol.su/goods/3719387/burovaya-ustanovka-uralmash.htm

Downloads

Published

2022-03-20

How to Cite

(1)
Hadid, D. M. M. .; Mohammed, A. A. . Optimal Choice of Travelling System Structure Depending on Design Parameters of Hoisting System in Drilling Units of Oil and Gas Wells. Journal of Petroleum Research and Studies 2022, 12, 121-136.