Smart Well Modelling for As Reservoir in AG Oil Field

Authors

  • Maaly S. Asad University of Karbala, College of Engineering, Department of Petroleum
  • Sameera M. Hamd-Alla University of Baghdad, College of Engineering, Department of Petroleum

DOI:

https://doi.org/10.52716/jprs.v12i1(Suppl.).625

Keywords:

Field development, PICD, AFCV, Tornado plot, Net Present Value.

Abstract

Intelligent or smart completion wells vary from conventional wells. They have downhole flow control devices like Inflow Control Devices (ICD) and Interval Control Valves (ICV) to enhance reservoir management and control, optimizing hydrocarbon output and recovery. However, to explain their adoption and increase their economic return, a high level of justification is necessary.

Smart horizontal wells also necessitate optimizing the number of valves, nozzles, and compartment length. A three-dimensional geological model of the As reservoir in AG oil field was used to see the influence of these factors on cumulative oil production and NPV. After creating the dynamic model for the As reservoir using the program Petrel (2017.4), we improve the robustness of forecasting production from smart wells using reservoir simulation. High-level details in the rock and fluid flow properties are required in the horizontal well region to capture the flow dynamics accurately. Thus, the study offers an enhanced method for predicting the performance of intelligent or smart wells in reservoir modeling.

This model was history matched for a period of 20 years for three horizontal wells by using program Petrel (2017.4) and ECLIPS (2011). After successful validation of model on a field scale and well level, performance prediction was carried out to see the effect of (number of valves, number of nozzle and compartment length) using PICD/AFCV completion. Optimizing well performance entails lowering water-cut. From an economic viewpoint, the goal is to maximize NPV or profit, depending on the situation, from PICD wells, which compared to other wells.

References

Grebenkin I.M., Davis D.R., Analysis of the Impact of an Intelligent Well Completion on the Oil Production Uncertainty, SPE 136335, 2010.

Emerick A.A., Portella R.C.M, Production Optimization With Intelligent Wells, SPE 107261, 2007.

Addiego-Guevara, E. A.; Jackson, M. D.; Giddins, M. A.; Insurance Value of Intelligent Well Technology against Reservoir Uncertainty, SPE 113918, 2008.

Al Qahtani A, Al Hashim H, Al Yousef H. “A new approach for optimization of long horizontal wells”, performances. Int Pet Technol Conf., 2015.

https ://doi.org/10.2523/IPTC-18372 -MS

Mojaddam Zadeh A, Slotte PA, Gyllensten AJ, Aasheim R, Irland K., “Optimal Inflow Control Devices Configurations for Oil Rim Reservoirs”. Offshore Technol Conf., 2012. https ://doi.org/10.4043/22963 -MS

Dosunmu I., Osisanya S., “An Economic Approach to Horizontal Well Length Optimization”. Soc Pet Eng., 2015. https ://doi. org/10.2118/17786 6-MS.

Glandt C.A. Reservoir Management mploying Smart Wells: A Review [Conference]. - Paper SPE 81107, SPE Drilling & Completion (December 2005), 20(4), pp. 281-288.

Al-Khelaiwi, F. T., Birchenko, V. M., Konopczynski, M. R., & Davies, D. R. “Advanced Wells: A Comprehensive Approach to the Selection between Passive and Active Inflow Control Completions”. International Petroleum Technology Conference, (2008, January 1). https://doi.org/10.2118/132976-PA.

Raghuraman B., Couet, B., Savundararaj, P., Baily, W.J. Valuation of Technologyand Information for Reservoir Risk Managment [Conference]. - SPE Reservoir Evaluation and Engineering (October 2003) 6(5), pp.307-315.

Ebadi F., Davies, D. R. “Techniques for Optimum Placement of Interval Control Valve(s) in an Intelligent Well” [Conference]. - Paper SPE 100191, presented at the SPE Europec/EAGE Conference and Exhibition held in Vienna, Austria, 12-15 June, 2006.

Yeten, B.; Brouwer, D. R; Durlofsky, L. J.; Aziz, K.; Decision Analysis under Uncertainty for Smart Well Deployment, Journal of Petroleum Science & Engineering, Elsevier, Amsterdam, 43 (2004) 183 -19.

Güyagüler B., Horne, R.N. Uncertainty Assessment of Well-Placement Optimization [Conference]. - SPE Reservoir Evaluation and Engineering (February 2004) 7(1), pp. 24-32.

Schlumberger PETREL* (2017) E&P Software Platform, user manual, version 2017.4

Schlumberger ECLIPSE (2011) simulation manuals, eclipse technical description.

Downloads

Published

2022-04-21

How to Cite

(1)
Asad, M. S.; Hamd-Alla, S. M. Smart Well Modelling for As Reservoir in AG Oil Field. Journal of Petroleum Research and Studies 2022, 12, 102-122.